One of largest and most unique projects we have ever completed. It consisted of the large-scale site preparation and construction of a water detention facility, including two tanks measuring 27,000 cubic feet in volume. A first of it’s kind in the area, the facility was constructed to control mountain drainage and flooding. Large track-hoes and graders were brought in to dig and grade a 30-foot hole on which the structure was built, and then subsequently backfilled with soil.